Marine Case Study: LNG Fuel Gas System for M/V Odon de Buen

Marine Case Study: LNG Fuel Gas System for M/V Odon de Buen


Cryonorm is proud to announce the successful on-time delivery, assembly, and commissioning of a turnkey LNG fuel gas system for the M/V Odon de Buen. Engineered at our facility in Alphen, this advanced system was specifically designed to meet the rigorous demands of the maritime industry.


Seamless System Integration for Marine Applications

• Custom-designed piping and instrumentation skids

• Fire-rated skid with quick-connect utilities for fast and secure installation

• Fully compliant with the IGF Code, integrated with the vessel’s automation and safety systems


Positive Environmental Impact

• Up to 25% reduction in CO₂ emissions compared to traditional marine diesel

• Near-zero methane slip and minimal particulate emissions

• Contributes to the shipowner’s net-zero strategy and sustainable marine operations


Project Highlights

• Delivered and commissioned in Q2 2025 in Spain

• A fully collaborative effort: engineering, fabrication, testing, and sea trial teams

• Engineered to support the future of clean-fuel maritime propulsion


This project is a testament to Cryonorm’s expertise in LNG fuel systems and clean energy technologies for the marine sector. With the M/V Odon de Buen now operating more efficiently and sustainably, it demonstrates how LNG is paving the way for the next generation of green shipping.



#MarineLNG #CleanShipping #Cryonorm #LNGPropulsion #Innovation #TeamWork




Share this post
Tags
Archive
Cryonorm Technology Supports Clean Transport Infrastructure in Poland